Gas Regulator Relocation work, supervised and Implemented by Pase Energy Team

Dear Hiver,

IMG2020092811461601.jpeg

Look at these two worker,their wide smile shown how happy they are during working time. Sovereign of energy is the basic right for every citizen including energy which consume in household for daily activities. Since 2016 Indonesia Government through Directorate General of Oil and Gas has implemented the city gas program with the most target was household as the target in receiving the gas installation directly to the household, the resource of gas supply is from the well gas production which as the authorized operator in charge is PERTAMINA as the biggest National company of Indonesia which act as the main company in oil and gas sector.

Lihatlah kedua pekerja ini, senyum lebar mereka menunjukkan betapa bahagianya mereka selama bekerja. Kedaulatan energi merupakan hak dasar setiap warga negara termasuk energi yang dikonsumsi dalam rumah tangga untuk kegiatan sehari-hari. Sejak tahun 2016 Pemerintah Indonesia melalui Direktorat Jenderal Minyak dan Gas telah melaksanakan program gas kota dengan target terbanyak adalah rumah tangga karena target penerimaan instalasi gas langsung ke rumah tangga, sumber pasokan gas berasal dari sumur produksi gas yang merupakan Operator resmi yang membawahi adalah PERTAMINA sebagai Perusahaan Nasional terbesar di Indonesia yang bertindak sebagai perusahaan induk di bidang minyak dan gas.

The work of managing the gas supply was subcontracted to the local partner in the area of city gas implementation, in the area of North Aceh Regency Pase Energy was the implementer for the supply of the household gas, this company is local company that certified under the government of North Aceh Regency that have been worked for this project for 4 years period.

Pekerjaan pengelolaan pasokan gas disubkontrakkan kepada mitra lokal di wilayah pelaksanaan gas kota, di wilayah Kabupaten Aceh Utara Pase Energy sebagai pelaksana penyediaan gas rumah tangga, perusahaan ini adalah perusahaan lokal bersertifikat dibawah Pemerintah Kabupaten Aceh Utara yang telah mengerjakan proyek ini selama 4 tahun.

Talk about implementing work, this company was dedicated and work professionally in ensuring gas supply to the almost 4000 customer in North Aceh Regency Especially Lahoksukon Area, and last month the community leaders sent the letter of notification regarding the Regulator Sector Box that need to be relocated from the initial place, this is due to the Mosque expansion construction at The Beringin Vilage of North Aceh Regency, they asked the authorized Company to relocated the position of Regulator Box to be moved to the corner site of the mosque building. Immediately, after receiving the notification letter team of Pase Energy forwarded this letter to the Pertagas Niaga the sub holding company of PERTAMINA that to get permission on tendering the relocation work of Regulator Box.

Bicara tentang pelaksanaan pekerjaan, perusahaan ini berdedikasi dan bekerja secara profesional dalam memastikan pasokan gas ke hampir 4000 pelanggan di Kabupaten Aceh Utara Khususnya Wilayah Lahoksukon, dan bulan lalu tokoh masyarakat mengirimkan surat pemberitahuan mengenai Regulator Sektor Box yang perlu direlokasi. Dari semula hal ini dikarenakan adanya pembangunan perluasan Masjid di Kampung Beringin Kabupaten Aceh Utara, mereka meminta kepada Perusahaan yang berwenang untuk merelokasi posisi Boks Regulator untuk dipindahkan ke lokasi sudut bangunan masjid. Segera setelah menerima surat pemberitahuan tersebut tim Pase Energy meneruskan surat tersebut kepada Pertagas Niaga anak perusahaan PERTAMINA yang akan mendapat izin tender pekerjaan relokasi Regulator Box.

Therefor, Pase Energy work as supervisor of this project work. the role of pase energy staff was only ensuring the work relocation is run optimally by the contractor so the supply of gas to the people who live around the regulator can receive gas as normally as before.

Untuk itu, Pase Energy bekerja sebagai pengawas pekerjaan proyek ini. Peran staf pase energy hanya memastikan relokasi pekerjaan dijalankan secara optimal oleh kontraktor sehingga pasokan gas ke masyarakat sekitar regulator dapat menerima gas seperti biasa seperti semula.

IMG2020092811382801.jpeg

Alex is one of Pase Energy is confirming the regulator is move partially

Alex, salah satu Staf Pase Energy, memastikan regulator dioindahkan terpisah.

IMG2020092812291601.jpeg

Box Regulation relocated from The initial place

Kotak regulator direlokasi dari tempat awal

IMG2020092812281301.jpeg

Munawir, Bai Reza, Alex, cekpon and Faisal helping the contractor in relocation work

Munawir, Bai Reza, Alex, cekpon dan Faisal membantu kontraktor dalam pekerjaan relokasi

IMG2020092819184001.jpeg

Supervising the contractor for joining the pipe into regulator

Mengawasi kontraktor untuk menyambungkan pipa ke regulator

IMG2020100314224501.jpeg

Faisal and suleman doing Final Check of Regulator Box

Faisal dan suleman melakukan Pemeriksaan Akhir Regulator

IMG20201003WA0025.jpg

Final Check of Regulator Box

Pemeriksaan Akhir Regulator

IMG20201003WA002401.jpeg

Cekpon serve as the Project Coordinator Supervisor for relocation work

Saiful bertindak sebagai Pengawas Koordinator Proyek untuk pekerjaan relokasi

6285262446525_status_c5b92b952a764ee59d914b0d27d2f91c.jpg

Pase Energy Team after Finishing work, coffee time

Tim Pase Energi setelah pekerjaan selesai, waktunya minum kopi

Team work is the most important thing that need to be maintain, to succeed the implementation of work. so what to be learned from this story is, the great team work will yield a great result.

Kerja tim merupakan hal terpenting yang perlu dijaga, untuk mensukseskan pelaksanaan pekerjaan. Jadi yang bisa dipelajari dari cerita ini adalah, kerja tim yang hebat akan membuahkan hasil yang bagus.

Regard

@faizarfatria