Attic Floor Down - September 16, 2021 @goldenoakfarm

Construction - west over living room done crop Sept. 2021.jpg

The carpenter came early at 6AM because he wanted to finish the attic floor before it got too hot. He got the area on the west side over the living room done.

Construction - north behind stairs done crop Sept. 2021.jpg

There were a couple pieces needed behind the stairwell on the north side and he got those in. Now all that’s left is to shorten the stovetop vent hose, repair the insulated box, and clean out all the scrap.

Then I can start moving stuff out of the old attic and into this one.

On Friday he will probably finish these jobs so the attic is done.