Studio Ceiling and Freeze Dryer - Sunday

Words
507
Reading
3 min
Listen
Play
6y

21 hours for the load of broccoli and banana to be finished. Both of them came out perfect. The banana has a way different texture than dehydrated and the flavor is more like a fresh banana than the condensed flavor of the dehydrated.

IMG_20201213_101830.jpg
IMG_20201213_101834.jpg

First thing in the morning I had to go to town. The primary thing I was after was the breaker box for the studio and dog food but I of course found a few other things that I needed. Once home I got the box mounted and some breakers tossed in it. The wire will be getting installed into the studio today so I can try to get the last wall buttoned up.

IMG_20201213_114009.jpg

stryeyz@stryeyz came up and helped me to put up 2 sheets of the sheet rock on the ceiling. I had to cut the sheets down a few inches on an end to match the rafters.

IMG_20201213_114014.jpg

I also had to install the little corner pieces that I had left unfinished but they took only a couple minutes each.

IMG_20201213_114743.jpg

We used a 2x3 to help press the sheet up evenly and I ran 4 screws per sheet with washers to spread the force a bit and not punch holes in the stuff. I am going to run more screws into them today but I wanted the insulation to compress first.

IMG_20201213_115204.jpg

We got the 2 sheets up in the bottom corners of the ceiling before we headed back to the house since our friend was stopping by.

IMG_20201213_115210.jpg

While in town I picked up this little LED grow bulb. My avocado tree always languishes inside in the winter with the lack of light so I have this now installed in the living room light fixture so it points at the tree. Hopefully it will help it through the winter months better.

IMG_20201213_130056.jpg
IMG_20201213_130103.jpg

Our friend brought over some food stuffs to run through the freeze dryer. She and stryeyz@stryeyz spent the afternoon prepping the ground beef, broccoli, apples, and spanish rice. It was about 5:45 pm when I started it and it has yet to reach the final dry as I write this and it has been over 14 hours so far.

IMG_20201213_160837.jpg
IMG_20201213_174023.jpg

It snowed just under 3 inches in the evening while I had a fire in the pit going so today will be fun for the boys to play and sled.

I have to take R to school this morning, work on the studio wiring and finish the wall, get squash ready for delivery tomorrow morning, shovel snow around the farm, and maybe roll a new bale into the sheep's pen.


Play Rabona the new soccer manager game on Hive!
https://rabona.io?ref=flemingfarm
Signup With my Link and we BOTH get 25K RBN

For more information about our farm:
Fleming Family Farm
FLEMING FAMILY FARM, LLC
Sustainable & Organic Methods | Heirloom Produce

All images are original works of Fleming Family Farm unless otherwise notated and credited.

If you find this post useful or entertaining, your support is greatly appreciated by upvoting, following, and sharing!


FFF Runic.png


Studio Ceiling and Freeze Dryer - Sunday | Ecency